Urgent Power Loss Across Five Floors Threatened Critical Research Operations in Central London
The Problem
The team encountered the critical issue of a power loss affecting a research facility across five floors in central London. This disruption posed significant challenges, potentially compromising ongoing operations and experiments within the facility. Urgent action was required to restore power and minimise disruptions to critical activities.
The Solution
Responding swiftly to the power loss crisis, our team mobilised resources and expertise to install a temporary N+1 300kVA power system. Despite the logistical complexities of navigating the early morning streets of London and maneuvering equipment across five floors, our team worked tirelessly to ensure uninterrupted power supply. By implementing this temporary solution, we effectively mitigated the impact of the power loss, enabling the research facility to continue its operations without interruption. This proactive approach reflects Pleavin Power’s commitment to providing reliable power solutions, even in the face of unexpected challenges.
The Results
- Effective power-loss impact mitigation, which meant the research facility to continue operations without interruptions.
This proactive approach reflects Pleavin Power’s commitment to providing reliable power solutions, even in the face of unexpected challenges.