Critical Power In Central London

The Problem

The team encountered the critical issue of a power loss affecting a research facility across five floors in central London. This disruption posed significant challenges, potentially compromising ongoing operations and experiments within the facility. Urgent action was required to restore power and minimize disruptions to critical activities.

The Solution

Responding swiftly to the power loss crisis, our team mobilized resources and expertise to install a temporary N+1 300kVA power system. Despite the logistical complexities of navigating the early morning streets of London and maneuvering equipment across five floors, our team worked tirelessly to ensure uninterrupted power supply. By implementing this temporary solution, we effectively mitigated the impact of the power loss, enabling the research facility to continue its operations without interruption. This proactive approach reflects Pleavin Power’s commitment to providing reliable power solutions, even in the face of unexpected challenges.

More Case Studies