The Problem
A 30MW energy from waste site suffered their fourth DNO supply cable failure of the year, putting their contractual obligations to collect and process waste in jeopardy.
Within 12 hours of the request coming in, Pleavin Power provided two specialist HV transformer substations consisting of 400v/11kV step up transformers coupled with HV switches to provide additional points of isolation and control, both coupled to an 11kV RMU, allowing a singular point of connection to the customer’s network by Pleavin Power’s own SAP alongside sites SAP.