Case Study: Powering Community Spirit: Mowgli Dog Show
Overview The Mowgli Dog Show, organised by the Mowgli Trust and Claremont Farm, is an annual event in the Wirral that supports local charity, Claire House. The family-friendly weekend features dog competitions, food stalls, children’s activities, a funfair, and live music. For the past three years, Pleavin Power has partnered with the team to ensure […]
Case Study: Restoring Generators to Operational Excellence
The Challenge The commencement of a significant new nationwide agreement presented our company with the opportunity to provide top-quality maintenance services to ensure the optimal condition of all our clients’ equipment. However, one particular site posed a unique challenge – the generators at this location had not been serviced for the past 20 years. This […]
Case Study: Enhancing Efficiency with Safety Kleen
The Challenge As we experienced growth, the need for efficient supplier relationships became increasingly evident. The company sought to optimize its procurement process and identify suppliers who could provide high-quality products and support for its critical power projects. The Solution Pleavin Power partnered with Safety Kleen, a leading provider of cleaning and environmental solutions, to […]
Case Study: A Research Facility In Central London
The Problem The team encountered the critical issue of a power loss affecting a research facility across five floors in central London. This disruption posed significant challenges, potentially compromising ongoing operations and experiments within the facility. Urgent action was required to restore power and minimize disruptions to critical activities. The Solution Responding swiftly to the […]
Case Study: Supporting VeloxServ, Data Centre & Server Hosting Company
The Problem VeloxServ, an independent UK Data Centre & Server Hosting company, found themselves facing significant challenges with their previous critical power provider. Poor communication and maintenance services were hindering VeloxServ’s ability to ensure the reliability and efficiency of their critical power systems. Recognizing the need for a change, VeloxServ sought out a new partner […]
Case Study: HV Subs At A Waste Centre
The Problem A 30MW energy from waste site suffered their fourth DNO supply cable failure of the year, putting their contractual obligations to collect and process waste in jeopardy. Within 12 hours of the request coming in, Pleavin Power provided two specialist HV transformer substations consisting of 400v/11kV step up transformers coupled with HV switches […]
Case Study: Major Pharmaceutical Research Facility
The Problem A Major Pharmaceutical Research Facility approached Pleavin Power after their incumbent generator provider was unable to support their switchgear upgrade and maintenance programme due to access and logistical challenges. The generators, distribution, and cabling had to be delivered into central London with limited access from the road and height restrictions on site, all […]
Case Study: Providing Long-Term Resilience To A Large FM Company
The Problem A large FM company contacted Pleavin Power to provide long-term resilience due to the expansion of the site, meaning the onsite generator was no longer capable of supporting the site load. Due to the increased capacity requirement, the existing cabling was not suitable, so Pleavin Power installed a 1KM long containment system providing […]
Case Study: Helping A Global Cloud & Streaming Provider
The Problem When a global cloud and streaming provider suffered a catastrophic failure of their N+2 Critical Power System during testing with their chosen maintenance provider they were left with a machine suffering main stator failure, a service provider unwilling to help and quotes to completely remove the power system from site for repair. The […]
Case Study: Helping A Global Pharmaceutical Provider| Pleavin Power
The Problem When a global Pharmaceutical provider suffered generator issues Pleavin Power were recommended to the client and contacted to survey, assess and offer a cost effective repair solution. Unfortunately having already paid for a ‘reconditioned’ generator what we found was a shock, a generator that met no standards, regulations or could perform the critical […]
Case Study: Global Rotating Machinery Repair Test Cell
The Problem Pleavin Power were contacted by the global leading organisation to offer support for a complex generating system that supports a specialist test cell, the system is extremely complex and built to support an extensive range of motor, pump and gear box testing scenarios at both 50 & 60Hz. The operators were struggling with […]
Case Study: Emergency Response For Global Animal Feed Manufacturer
The Problem When a global animal feed manufacturer was suffering downtime due to loss of electricity supply and their critical standby generator failed, Pleavin Power were called upon to support them. From initial mobilisation to having resource on site took 38 minutes. Once an engineer made an assessment of the situation the decision was made […]
Case Study: Helping The Global Shipping Organisation
The Problem Pleavin Power were contacted by the global shipping organisation after they had suffered from prime power failure whilst at sea, we arranged for our reactive response team to meet with the ship as it came into port to immediately commence an investigation and identify the route cause of the issues. We found heavy […]